IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

630

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0037 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $105,200 $0 Implemented
DL0037 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $644 $140 Implemented
DL0037 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,050 $5,000 Not Implemented
DL0037 # 04 Y:2009 04 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,500 $880 Not Implemented
DL0037 # 05 Y:2009 05 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,330 $8,800 Not Implemented
DL0037 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,254 $35,000 Not Implemented
LE0284 # 01 Y:2009 01 2009 UPGRADE OBSOLETE EQUIPMENT $42,827 $30,000 Not Implemented
LE0284 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,473 $20,000 Not Implemented
LE0284 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $11,124 $8,000 Not Implemented
LE0284 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,628 $1,760 Implemented
LE0284 # 05 Y:2009 05 2009 USE SOLAR HEAT TO HEAT WATER $7,038 $28,000 Not Implemented
LE0284 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,526 $8,000 Not Implemented
LE0284 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,560 $7,000 Not Implemented
LE0284 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,911 $320 Implemented
LE0284 # 09 Y:2009 09 2009 REPAIR OR REPLACE STEAM TRAPS $2,855 $2,000 Implemented
LE0284 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $224 Implemented
LE0284 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $771 $800 Not Implemented
LE0284 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,937 $10,491 Not Implemented
LE0284 # 13 Y:2009 13 2009 INSTALL OCCUPANCY SENSORS $685 $675 Not Implemented
WV0377 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,957 $5,000 Implemented
WV0377 # 02 Y:2008 02 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $14,777 $18,980 Not Implemented
WV0377 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,568 $25,978 Implemented
WV0377 # 04 Y:2008 04 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,122 $231 Implemented
WV0377 # 05 Y:2008 05 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,506 $1,000 Implemented
WV0377 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $5,730 $815 Implemented