IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0308 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,204 $698 Implemented
SU0308 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $8,338 $1,725 Not Implemented
SU0308 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,713 $625 Implemented
SU0308 # 05 Y:2011 05 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $628 $641 Not Implemented
SU0308 # 06 Y:2011 06 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $16,654 $27,750 Not Implemented
UW0049 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,931 $67,308 Not Implemented
UW0049 # 02 Y:2011 02 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,443 $7,200 Implemented
UW0049 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $1,300 Implemented
UW0049 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,029 $1,810 Not Implemented
GT0880 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,831 $1,250 Implemented
GT0880 # 02 Y:2011 02 2011 USE SYNTHETIC LUBRICANT $13,152 $0 Not Implemented
GT0880 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,390 $244 Not Implemented
GT0880 # 04 Y:2011 04 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $75,872 $100,115 Implemented
GT0880 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $70,097 $17,000 Implemented
GT0880 # 06 Y:2011 06 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,994 $5,000 Not Implemented
GT0880 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,232 $38,000 Not Implemented
LL0349 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,074 $4,720 Implemented
LL0349 # 02 Y:2011 02 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,614 $150 Not Implemented
LL0349 # 03 Y:2011 03 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,752 $384 Not Implemented
LL0349 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,238 $2,563 Not Implemented
LL0349 # 05 Y:2011 05 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $116 $195 Not Implemented
LL0349 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $51 Not Implemented
UW0047 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,466 $57,117 Not Implemented
UW0047 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,626 $11,606 Not Implemented
UW0047 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $400 $410 Not Implemented