IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

582

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0601 # 07 Y:2023 07 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $12,826 $62,630 Not Implemented
OR0770 # 01 Y:2023 01 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,142 $6,704 Implemented
OR0770 # 02 Y:2023 02 2023 REDUCE SCRAP PRODUCTION $111,700 $282,420 Not Implemented
OR0770 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,249 $9,000 Implemented
OR0770 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Not Implemented
SF0600 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,276 $0 Not Implemented
SF0600 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $738 $50 Implemented
SF0600 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,662 $6,270 Not Implemented
SF0600 # 04 Y:2023 04 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $17,278 $24,708 Not Implemented
SF0600 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $937 $3,563 Not Implemented
SF0600 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $50,839 $316,988 Implemented
DL0223 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $9,025 $0 Implemented
DL0223 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,437 $1,030 Implemented
DL0223 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,840 $2,800 Not Implemented
DL0223 # 04 Y:2023 04 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $994 $4,800 Implemented
DL0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $490,980 $10,000 Not Implemented
DL0223 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,906 $7,955 Not Implemented
MU0025 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,630 $360 Implemented
MU0025 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,096 $0 Implemented
MU0025 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $37 $50 Implemented
MU0025 # 04 Y:2023 04 2023 KEEP EQUIPMENT CLEAN $332 $0 Implemented
MU0025 # 05 Y:2023 05 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $382 $690 Not Implemented
MU0025 # 06 Y:2023 06 2023 USE OPTIMUM TEMPERATURE $1,361 $0 Implemented
MU0025 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,434 $2,876 Implemented
MU0025 # 08 Y:2023 08 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $0 Implemented