Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,699
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0099 # 05 Y:2017 | 05 | 2017 | TREAT AND REUSE RINSE WATERS | $773 | $7,514 | Not Implemented |
BS0099 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $456 | $7 | Not Implemented |
BS0099 # 07 Y:2017 | 07 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $428 | $308 | Not Implemented |
BS0099 # 08 Y:2017 | 08 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $135 | $13 | Not Implemented |
BS0099 # 09 Y:2017 | 09 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $50 | $260 | Not Implemented |
MZ0231 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,949 | $28,500 | Implemented |
MZ0231 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,265 | $12,363 | Implemented |
MZ0231 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,125 | $30 | Implemented |
MZ0231 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $713 | $250 | Implemented |
MZ0231 # 05 Y:2017 | 05 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,356 | $8,300 | Not Implemented |
MZ0231 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,438 | $11,250 | Implemented |
MZ0231 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $20,503 | $34,150 | Implemented |
MZ0231 # 08 Y:2017 | 08 | 2017 | INSULATE BARE EQUIPMENT | $3,785 | $21,000 | Implemented |
MI0314 # 01 Y:2017 | 01 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,333 | $6,560 | Implemented |
MI0314 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,727 | $1,660 | Not Implemented |
MI0314 # 03 Y:2017 | 03 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,444 | $3,600 | Implemented |
MI0314 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,595 | $12,009 | Implemented |
MI0314 # 05 Y:2017 | 05 | 2017 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $4,033 | $12,706 | Not Implemented |
MI0314 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,364 | $1,125 | Implemented |
MI0314 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,023 | $1,885 | Not Implemented |
MI0314 # 08 Y:2017 | 08 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,679 | $290 | Implemented |
MI0314 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $518 | $466 | Not Implemented |
MI0314 # 10 Y:2017 | 10 | 2017 | USE PHOTOCELL CONTROLS | $437 | $240 | Not Implemented |
TR0002 # 01 Y:2017 | 01 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $30,725 | $22,000 | Implemented |
TR0002 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $500 | Implemented |