Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,566
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0609 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,389 | $1,640 | n/a |
SF0609 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM THICKNESS INSULATION | $1,473 | $338 | n/a |
SF0609 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,090 | $2,155 | n/a |
SF0609 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $32,617 | $36,367 | n/a |
SF0609 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,467 | $66,447 | n/a |
SF0609 # 07 Y:2023 | 07 | 2023 | USE OPTIMUM THICKNESS INSULATION | $8,652 | $21,442 | n/a |
SF0609 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,153 | $9,827 | n/a |
SF0609 # 09 Y:2023 | 09 | 2023 | INSTALL WIND POWERED ELECTRIC GENERATOR | $426,217 | $1,338,900 | n/a |
LS2320 # 01 Y:2023 | 01 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $5,364 | $0 | n/a |
LS2320 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $507 | $25 | n/a |
LS2320 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,333 | $1,369 | n/a |
LS2320 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,628 | $171,600 | n/a |
LS2319 # 01 Y:2023 | 01 | 2023 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $12,150 | $0 | n/a |
LS2319 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $50 | n/a |
LS2319 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $1,365 | n/a |
LS2319 # 04 Y:2023 | 04 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $307 | $230 | n/a |
LS2319 # 05 Y:2023 | 05 | 2023 | USE OTHER WASTE CONCENTRATION METHODS | $34,000 | $200,000 | n/a |
OR0780 # 01 Y:2023 | 01 | 2023 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $35,316 | $540,000 | Not Implemented |
OR0780 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,517 | $2,000 | Implemented |
OR0780 # 03 Y:2023 | 03 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,453 | $14,157 | Not Implemented |
OR0780 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,666 | $24,285 | Not Implemented |
DL0228 # 01 Y:2023 | 01 | 2023 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $4,024 | $700 | n/a |
DL0228 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,279 | $0 | n/a |
DL0228 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,322 | $37,499 | n/a |
DL0228 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,115 | $4,102 | n/a |