IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0227 # 05 Y:2012 05 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,886 $142,619 Implemented
MI0227 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,306 $12,160 Implemented
MI0227 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,036 $13,230 Not Implemented
MI0227 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,569 $8,859 Not Implemented
MI0227 # 09 Y:2012 09 2012 HEAT WATER WITH EXHAUST HEAT $6,137 $8,859 Not Implemented
MI0227 # 10 Y:2012 10 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,975 $3,480 Not Implemented
MI0227 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $3,170 $3,500 Not Implemented
MI0225 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $114,097 $23,031 Implemented
MI0225 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,492 $29,008 Not Implemented
MI0225 # 03 Y:2012 03 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $27,049 $190,339 Implemented
MI0225 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,052 $1,660 Implemented
MI0225 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $13,619 $520 Implemented
MI0225 # 06 Y:2012 06 2012 USE POWER DURING OFF-PEAK PERIODS $11,955 $800 Not Implemented
MI0225 # 07 Y:2012 07 2012 HEAT WATER WITH EXHAUST HEAT $5,925 $8,000 Not Implemented
MI0225 # 08 Y:2012 08 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,502 $2,372 Not Implemented
MI0225 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,598 $80 Implemented
MI0225 # 10 Y:2012 10 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,046 $255 Implemented
MI0211 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $25,532 $213,119 Implemented
MI0211 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,191 $41,400 Implemented
MI0211 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,390 $25,000 Not Implemented
MI0211 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,111 $1,320 Implemented
MI0211 # 05 Y:2011 05 2011 HEAT WATER WITH EXHAUST HEAT $16,479 $30,000 Not Implemented
MI0211 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,771 $1,950 Implemented
MI0211 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,618 $50 Implemented
MI0211 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,475 $1,720 Not Implemented