Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
529
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0156 # 01 Y:1985 | 01 | 1985 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $93,873 | $350,000 | Not Implemented |
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0156 # 03 Y:1985 | 03 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,350 | $2,500 | Not Implemented |
KU0156 # 04 Y:1985 | 04 | 1985 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $1,428 | $2,000 | Not Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 06 Y:1985 | 06 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,611 | $1,200 | Implemented |
KU0156 # 07 Y:1985 | 07 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,298 | $1,200 | Implemented |
KU0156 # 08 Y:1985 | 08 | 1985 | INSULATE BARE EQUIPMENT | $311 | $187 | Not Implemented |
KU0156 # 09 Y:1985 | 09 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,323 | $0 | Not Implemented |
KU0156 # 10 Y:1985 | 10 | 1985 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $239 | $0 | Not Implemented |
KU0156 # 11 Y:1985 | 11 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $141 | $40 | Not Implemented |
KU0129 # 01 Y:1984 | 01 | 1984 | IMPROVE LUBRICATION PRACTICES | $15,682 | $1,300 | Not Implemented |
KU0129 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,014 | $6,400 | Not Implemented |
KU0129 # 03 Y:1984 | 03 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,368 | $3,000 | Implemented |
KU0129 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,366 | $0 | Implemented |
KU0129 # 05 Y:1984 | 05 | 1984 | INSTALL TURBULATORS | $7,337 | $2,000 | Implemented |
KU0129 # 06 Y:1984 | 06 | 1984 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $4,922 | $3,000 | Implemented |
KU0129 # 07 Y:1984 | 07 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,524 | $8,000 | Not Implemented |
KU0129 # 08 Y:1984 | 08 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,411 | $1,330 | Not Implemented |
KU0129 # 09 Y:1984 | 09 | 1984 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,264 | $2,500 | Implemented |
KU0129 # 10 Y:1984 | 10 | 1984 | SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE | $5,557 | $300 | Implemented |
KU0129 # 12 Y:1984 | 12 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,428 | $3,565 | Implemented |
KU0129 # 13 Y:1984 | 13 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,710 | $960 | Implemented |
KU0129 # 14 Y:1984 | 14 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,390 | $4,520 | Not Implemented |
KU0129 # 15 Y:1984 | 15 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $495 | $500 | Implemented |