IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

434

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0230 # 04 Y:1995 04 1995 TREAT AND REUSE RINSE WATERS $463 $0 Not Implemented
OR0230 # 05 Y:1995 05 1995 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $12,942 $1,372 Not Implemented
OR0204 # 01 Y:1994 01 1994 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,122 $5,000 Implemented
OR0204 # 02 Y:1994 02 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $912 $3,000 Implemented
OR0204 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $7,860 $8,997 Implemented
OR0204 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $4,057 $5,100 Not Implemented
OR0204 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $2,378 $1,394 Implemented
OR0204 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $376 $1,075 Implemented
OR0193 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,170 $5,000 Implemented
OR0193 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,796 $0 Implemented
OR0193 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,033 $7,596 Not Implemented
OR0193 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $158 $425 Implemented
OR0193 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $4,913 Not Implemented
OR0193 # 06 Y:1993 06 1993 OPTIMIZE PLANT POWER FACTOR $2,954 $9,000 Not Implemented
OR0193 # 07 Y:1993 07 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,806 $1,000 Implemented
OR0193 # 08 Y:1993 08 1993 AIR CONDITION ONLY SPACE NECESSARY $6,042 $6,116 Implemented
OR0193 # 09 Y:1993 09 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,099 $39,000 Implemented
OR0125 # 01 Y:1991 01 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $18,739 $0 Implemented
OR0125 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,392 $6,072 Implemented
OR0125 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,391 $35,042 Implemented
OR0125 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,743 $0 Implemented
OR0125 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,934 $83,040 Implemented
OR0044 # 01 Y:1988 01 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,498 $0 Implemented
OR0044 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,775 $500 Implemented
OR0044 # 03 Y:1988 03 1988 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,200 $1,108 Implemented