IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0440 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,370 $3,778 Not Implemented
UF0440 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,580 $12,180 Not Implemented
UF0440 # 06 Y:2011 06 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $136 $244 Not Implemented
UF0440 # 07 Y:2011 07 2011 INSTALL TURBULATORS $3,745 $3,750 Not Implemented
UF0440 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,493 $9,387 Not Implemented
UF0440 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $2,620 $243 Not Implemented
UF0440 # 10 Y:2011 10 2011 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $635 $0 Not Implemented
UF0440 # 11 Y:2011 11 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,423 $840 Not Implemented
UM0381 # 01 Y:2011 01 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $17,794 $4,850 Not Implemented
UM0381 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,985 $5,032 Implemented
UM0381 # 03 Y:2011 03 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,946 $200 Not Implemented
UM0381 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $119 $600 Not Implemented
UM0381 # 05 Y:2011 05 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $82 $10 Implemented
UM0381 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,186 $1,200 Not Implemented
UM0381 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,850 $1,100 Not Implemented
UM0381 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,426 $3,926 Not Implemented
UM0381 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $1,350 $783 Not Implemented
UM0381 # 10 Y:2011 10 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $629 $220 Implemented
SD0432 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,239 $0 Implemented
SD0432 # 02 Y:2011 02 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,059 $800 Implemented
SD0432 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $214 $100 Not Implemented
SD0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,412 $800 Not Implemented
SD0432 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $204 $427 Implemented
SD0432 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,408 $8,000 Not Implemented
SD0432 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,373 $8,285 Not Implemented