IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

533

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0257 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $2,579 $290 Implemented
CO0684 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,830 $3,600 Not Implemented
CO0684 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $920 $2,600 Not Implemented
CO0684 # 03 Y:2014 03 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $28,690 $96,370 Not Implemented
CO0684 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,790 $1,500 Implemented
SD0481 # 01 Y:2014 01 2014 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $134,111 $80,720 Implemented
SD0481 # 02 Y:2014 02 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,872 $91,000 Implemented
SD0481 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,839 $1,000 Implemented
SD0481 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $22,759 $25,200 Not Implemented
SD0481 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,116 $2,600 Implemented
SD0481 # 06 Y:2014 06 2014 MAINTAIN MACHINES TO REDUCE LEAKS $14,877 $5,000 Implemented
SD0481 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,167 $16,320 Implemented
SD0481 # 08 Y:2014 08 2014 REPAIR AND ELIMINATE STEAM LEAKS $2,220 $1,200 Implemented
SD0481 # 09 Y:2014 09 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,553 $2,325 Implemented
UD0899 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,057 $0 Not Implemented
UD0899 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $388 $0 Implemented
UD0899 # 03 Y:2014 03 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $85 $0 Not Implemented
UD0899 # 04 Y:2014 04 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,795 $4,550 Not Implemented
UD0899 # 05 Y:2014 05 2014 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $2,075 $0 Implemented
UD0899 # 06 Y:2014 06 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,303 $0 Implemented
UD0899 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,350 $7,126 Not Implemented
UD0899 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $969 $2,127 Implemented
UD0899 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,254 $15,180 Not Implemented
UD0899 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,255 $5,850 Not Implemented
UD0899 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,635 $3,920 Not Implemented