IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0209 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,204 $29,679 Implemented
MI0209 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,599 $1,320 Implemented
MI0209 # 09 Y:2011 09 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,681 $50 Implemented
MI0209 # 10 Y:2011 10 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,382 $2,550 Not Implemented
MI0209 # 11 Y:2011 11 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,779 $45,345 Not Implemented
MI0209 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $13,268 $3,200 Implemented
MI0209 # 13 Y:2011 13 2011 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $7,944 $2,000 Not Implemented
MI0209 # 14 Y:2011 14 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,235 $3,450 Implemented
MI0209 # 15 Y:2011 15 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $3,926 $3,450 Implemented
UF0440 # 01 Y:2011 01 2011 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $43,145 $25,340 Not Implemented
UF0440 # 02 Y:2011 02 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,404 $5,896 Not Implemented
UF0440 # 03 Y:2011 03 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,173 $1,818 Not Implemented
UF0440 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,370 $3,778 Not Implemented
UF0440 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,580 $12,180 Not Implemented
UF0440 # 06 Y:2011 06 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $136 $244 Not Implemented
UF0440 # 07 Y:2011 07 2011 INSTALL TURBULATORS $3,745 $3,750 Not Implemented
UF0440 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,493 $9,387 Not Implemented
UF0440 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $2,620 $243 Not Implemented
UF0440 # 10 Y:2011 10 2011 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $635 $0 Not Implemented
UF0440 # 11 Y:2011 11 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,423 $840 Not Implemented
MI0193 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $159,261 $64,000 Not Implemented
MI0193 # 02 Y:2010 02 2010 HEAT WATER WITH EXHAUST HEAT $100,762 $23,000 Implemented
MI0193 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,162 $63,083 Implemented
MI0193 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,000 $1,210 Implemented
MI0193 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,004 $40 Implemented