IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0043 # 05 Y:2014 05 2014 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $13,508 $17,493 Not Implemented
BS0043 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,075 $429 Implemented
BS0043 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,042 $52,954 Not Implemented
BS0043 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,340 $981 Not Implemented
ORS005 # 08 Y:1999 08 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $139,000 $280,000 Not Implemented
ORS005 # 09 Y:1999 09 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $310,000 $69,000 Implemented
ORS005 # 10 Y:1999 10 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $0 $490 Implemented
ORS005 # 11 Y:1999 11 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,489 $6,220 Not Implemented
ORS005 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $350,000 $570,000 Not Implemented
ORS005 # 02 Y:1999 02 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $403,875 $572,000 Not Implemented
ORS005 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,531 $41,296 Implemented
ORS005 # 04 Y:1999 04 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $18,500 $40,000 Implemented
ORS005 # 03 Y:1999 03 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $55,755 $0 Implemented
ORS005 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,920 $700 Implemented
ORS005 # 06 Y:1999 06 1999 MOVE PRODUCT USING MECHANICAL MEANS $97,200 $11,600 Not Implemented
ORS004 # 06 Y:1999 06 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $14,000 $6,360 Not Implemented
ORS004 # 10 Y:1999 10 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,305 $1,725 Not Implemented
ORS004 # 09 Y:1999 09 1999 MINIMIZE WATER USAGE $14,760 $6,800 Implemented
ORS004 # 08 Y:1999 08 1999 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $8,525 $1,270 Implemented
ORS004 # 02 Y:1999 02 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $324,184 $540,530 Not Implemented
ORS004 # 11 Y:1999 11 1999 MINIMIZE WATER USAGE $2,930 $0 Implemented
ORS004 # 07 Y:1999 07 1999 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $10,860 $6,170 Not Implemented
ORS004 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,658 $19,518 Implemented
ORS004 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,758 $4,840 Implemented
ORS004 # 01 Y:1999 01 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,048 $0 Implemented