IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0420 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,784 $3,190 Not Implemented
MI0420 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $65,480 $580 Implemented
UF0591 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,481 $66,747 Implemented
UF0591 # 08 Y:2023 08 2023 INSTALL TURBULATORS $1,724 $7,500 Not Implemented
UF0591 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $460,292 $1,330,000 Not Implemented
UF0591 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $12,470 $19,320 Implemented
UF0591 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $48,128 $44,635 Implemented
UF0591 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,896 $8,591 Implemented
UF0591 # 06 Y:2023 06 2023 INSTALL SUB-METERING EQUIPMENT $2,168 $8,880 Implemented
UF0591 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,713 $0 Implemented
UF0590 # 03 Y:2023 03 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $16,705 $11,574 Implemented
UF0590 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,955 $25,440 Implemented
UF0590 # 07 Y:2023 07 2023 REPAIR AND ELIMINATE STEAM LEAKS $3,034 $528 Implemented
UF0590 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,544 $67,849 Implemented
UF0590 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $31,115 $12,420 Implemented
UF0590 # 08 Y:2023 08 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $79,607 $10,000 Implemented
UF0590 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $101,164 $60,322 Not Implemented
UF0590 # 06 Y:2023 06 2023 INSTALL SUB-METERING EQUIPMENT $10,106 $11,100 Implemented
MI0417 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,845 $0 Implemented
MI0417 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,907 $580 Not Implemented
MI0417 # 05 Y:2022 05 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,078 $12,846 Not Implemented
MI0417 # 01 Y:2022 01 2022 UPGRADE CONTROLS ON COMPRESSORS $58,143 $16,338 Not Implemented
MI0417 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,839 $2,140 Implemented
MI0417 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,705 $18,960 Not Implemented
MI0417 # 07 Y:2022 07 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,772 $2,740 Not Implemented