IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0161 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $128 $328 Implemented
IP0161 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $0 Implemented
IP0161 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $94 $0 Implemented
UD1042 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,096 $3,000 Not Implemented
UD1042 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $301,346 $63,514 Not Implemented
UD1042 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $19,440 $0 Not Implemented
UD1042 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,724 $3,750 Not Implemented
UD1042 # 02 Y:2022 02 2022 REDUCE VENTILATION AIR $10,167 $0 Not Implemented
UD1042 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,033 $0 Not Implemented
UD1042 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,761 $14,000 Not Implemented
IP0133 # 05 Y:2020 05 2020 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,196 $4,991 Not Implemented
IP0133 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,033 $14,189 Not Implemented
IP0133 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $1,574 $343 Not Implemented
IP0133 # 02 Y:2020 02 2020 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $2,073 $1,218 Not Implemented
IP0133 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $618 $553 Not Implemented
UD1012 # 06 Y:2020 06 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $67,773 $0 Implemented
UD1012 # 07 Y:2020 07 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $49,540 $21,295 Implemented
UD1012 # 08 Y:2020 08 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $46,434 $0 Not Implemented
UD1012 # 09 Y:2020 09 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,338 $0 Implemented
UD1012 # 11 Y:2020 11 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $86,219 $9,464 Not Implemented
UD1012 # 10 Y:2020 10 2020 OPTIMIZE PLANT POWER FACTOR $145,150 $100,000 Not Implemented
UD1012 # 12 Y:2020 12 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $34,941 $20,000 Not Implemented
UD1012 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,521 $1,000 Not Implemented
UD1012 # 16 Y:2020 16 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,160 $0 Implemented
UD1012 # 17 Y:2020 17 2020 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $24,810 $35,000 Implemented