IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,034

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0780 # 03 Y:2023 03 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,453 $14,157 Not Implemented
OR0780 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,517 $2,000 Implemented
OR0775 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,277 $41,745 Not Implemented
OR0775 # 01 Y:2023 01 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $174,406 $233,000 Not Implemented
OR0775 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $563 $261 Not Implemented
OR0773 # 04 Y:2023 04 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,262 $12,121 Not Implemented
OR0773 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,051 $797 Implemented
OR0773 # 01 Y:2023 01 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,439 $1,278 Implemented
OR0773 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,507 $13,124 Not Implemented
OR0770 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,249 $9,000 Implemented
OR0770 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Not Implemented
OR0770 # 01 Y:2023 01 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,142 $6,704 Implemented
OR0770 # 02 Y:2023 02 2023 REDUCE SCRAP PRODUCTION $111,700 $282,420 Not Implemented
OR0768 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,178 $5,693 Implemented
OR0768 # 01 Y:2023 01 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,535 $8,125 Implemented
OR0768 # 02 Y:2023 02 2023 USE AUTOMATIC FLOW CONTROL $24,867 $9,600 Not Implemented
OR0763 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $5,819 $13,838 Not Implemented
OR0763 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $7,412 $89,663 Not Implemented
OR0763 # 01 Y:2023 01 2023 ADOPT IN-HOUSE MATERIAL GENERATION $172,258 $46,346 Not Implemented
OR0757 # 04 Y:2022 04 2022 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $194,400 $300,000 Not Implemented
OR0757 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,612 $0 Not Implemented
OR0757 # 03 Y:2022 03 2022 INSTALL AUTOMATIC PACKING EQUIPMENT $97,200 $50,000 Not Implemented
OR0757 # 02 Y:2022 02 2022 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $26,900 $0 Not Implemented
OR0753 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,938 $40,624 Not Implemented
OR0753 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $14,927 $278,534 Not Implemented