Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,196
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0429 # 09 Y:2009 | 09 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $19,795 | $0 | Not Implemented |
UF0429 # 10 Y:2009 | 10 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,346 | $0 | Not Implemented |
UF0429 # 11 Y:2009 | 11 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,435 | $0 | Not Implemented |
UF0429 # 12 Y:2009 | 12 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,025 | $0 | Not Implemented |
UF0429 # 13 Y:2009 | 13 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,269 | $0 | Implemented |
UF0429 # 14 Y:2009 | 14 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $68,295 | $0 | Not Implemented |
MI0183 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,088 | $1,360 | Implemented |
MI0183 # 02 Y:2009 | 02 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,816 | $1,280 | Not Implemented |
MI0183 # 03 Y:2009 | 03 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,012 | $1,200 | Not Implemented |
MI0183 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,501 | $2,320 | Not Implemented |
MI0183 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,481 | $320 | Implemented |
MI0183 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,750 | $1,500 | Implemented |
MI0183 # 07 Y:2009 | 07 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $198 | $180 | Not Implemented |
MI0183 # 08 Y:2009 | 08 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $133 | $60 | Implemented |
UF0426 # 01 Y:2009 | 01 | 2009 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $20,276 | $4,000 | Not Implemented |
UF0426 # 02 Y:2009 | 02 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $146,810 | $3,192 | Not Implemented |
UF0426 # 03 Y:2009 | 03 | 2009 | RECYCLE FLUORESCENT LAMPS | $328 | $3,405 | Not Implemented |
UF0426 # 04 Y:2009 | 04 | 2009 | INSTALL SKYLIGHTS | $2,555 | $238 | Implemented |
UF0426 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $1,764 | $481 | Not Implemented |
UF0426 # 06 Y:2009 | 06 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $50,000 | $25,000 | Not Implemented |
UF0426 # 07 Y:2009 | 07 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,382 | $2,382 | Not Implemented |
UF0426 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $234,287 | $67,220 | Not Implemented |
UF0426 # 09 Y:2009 | 09 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,528 | $628 | Implemented |
UF0426 # 10 Y:2009 | 10 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,591 | $568 | Not Implemented |
UF0426 # 11 Y:2009 | 11 | 2009 | INSTALL OCCUPANCY SENSORS | $24,539 | $0 | Not Implemented |