IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

678

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0440 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,930 $16,704 Implemented
OK0440 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,522 $5,878 Implemented
OK0440 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,037 $700 Implemented
OK0440 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $368 $0 Implemented
OK0440 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $214 $258 Implemented
GT0523 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,190 $6,500 Not Implemented
GT0523 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,060 $500 Implemented
GT0523 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $19,520 $40,000 Implemented
GT0523 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $80 $100 Implemented
GT0523 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $660 $2,000 Not Implemented
GT0523 # 06 Y:1994 06 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $620 $1,750 Not Implemented
GT0523 # 07 Y:1994 07 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $930 $1,220 Implemented
OR0204 # 01 Y:1994 01 1994 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,122 $5,000 Implemented
OR0204 # 02 Y:1994 02 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $912 $3,000 Implemented
OR0204 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $7,860 $8,997 Implemented
OR0204 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $4,057 $5,100 Not Implemented
OR0204 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $2,378 $1,394 Implemented
OR0204 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $376 $1,075 Implemented
SF0024 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,615 $15,734 Implemented
SF0024 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,091 $12,697 Implemented
SF0024 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $11,565 $13,467 Implemented
SF0024 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,728 $10,400 Implemented
SF0024 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $3,399 $6,386 Implemented
SF0024 # 06 Y:1994 06 1994 REDESIGN PROCESS $4,700 $15,500 Implemented
SF0024 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,105 $5,500 Implemented