IAC Assessment: SF0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1994
Principal Product Candy
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 210,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 4,144
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $640,059 7,902,990 kWh $0.08
Natural Gas $167,892 49,359 MMBtu $3.40
TOTAL ENERGY COSTS $807,951
RECOMMENDED SAVINGS* $462,686 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,533
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$20,615
Cost:
$15,734
$20,615 254,689 - - $20,615
254,689
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,091
Cost:
$12,697
$7,091 87,632 - - $7,091
87,632
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$11,565
Cost:
$13,467
$11,565 142,732 - - $11,565
142,732
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,728
Cost:
$10,400
$7,728 95,545 - - $7,728
95,545
kWh
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,399
Cost:
$6,386
$3,399 - - - $3,399
-
kWh
-
-
MMBtu
06: 2.5194 REDESIGN PROCESS Savings:
$4,700
Cost:
$15,500
- - $4,700 2,124 -
-
kWh
$4,700
2,124
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,105
Cost:
$5,500
$1,105 13,775 - - $1,105
13,775
kWh
-
-
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,300
Cost:
$200
$4,300 53,048 - - $4,300
53,048
kWh
-
-
MMBtu
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,030
Cost:
-
- - $3,030 891 -
-
kWh
$3,030
891
MMBtu
10: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$399,153
Cost:
$979,000
$464,337 6,072,685 $(-65,184) (-19,166) $464,337
6,072,685
kWh
$(-65,184)
(-19,166)
MMBtu
TOTAL RECOMMENDED Savings:
$462,686
Cost:
$1,058,884
$520,140 6,720,106 $(-57,454) (-16,151) $520,140
6,720,106
kWh
$(-57,454)
(-16,151)
MMBtu
TOTAL IMPLEMENTED Savings:
$63,533
Cost:
$79,884
$55,803 647,421 $7,730 3,015 $55,803
647,421
kWh
$7,730
3,015
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas