IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

722

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0128 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,703 $1,074 Implemented
MI0128 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,762 $4,800 Not Implemented
MI0128 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,984 $30 Implemented
AM0507 # 01 Y:2006 01 2006 COMBINE UTILITY METERS $71,000 $100,000 Implemented
AM0507 # 02 Y:2006 02 2006 $37,900 $600 Implemented
AM0507 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,000 $51,000 Not Implemented
AM0507 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $13,750 $2,100 Implemented
AM0507 # 05 Y:2006 05 2006 USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) $7,616 $25,000 Not Implemented
AM0507 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $9,000 $500 Implemented
AM0507 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $400 Implemented
AM0507 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,900 $9,900 Implemented
AM0507 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,430 $1,620 Implemented
AM0507 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $733 $0 Implemented
AM0507 # 11 Y:2006 11 2006 USE PHOTOCELL CONTROLS $1,120 $100 Implemented
AM0507 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $215 Implemented
SU0231 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,122 $0 Not Implemented
SU0231 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,090 $0 Implemented
SU0231 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $1,337 $0 Implemented
SU0231 # 04 Y:2006 04 2006 KEEP BOILER TUBES CLEAN $8,242 $1,800 Implemented
SU0231 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,758 $823 Implemented
SU0231 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,335 $19,002 Not Implemented
SU0231 # 07 Y:2006 07 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $256 $755 Implemented
SU0231 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $89 $266 Implemented
SU0231 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,405 $12,425 Not Implemented
UU0101 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,190 $10,000 Not Implemented