Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
772
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0301 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,466 | $0 | Not Implemented |
SF0301 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $914 | $0 | Not Implemented |
SF0301 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $819 | $0 | Not Implemented |
SF0301 # 04 Y:2005 | 04 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $11,812 | $1,220 | Not Implemented |
SF0301 # 05 Y:2005 | 05 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $524 | $492 | Not Implemented |
SF0301 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,905 | $2,148 | Not Implemented |
SF0301 # 07 Y:2005 | 07 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $738 | $1,086 | Not Implemented |
SF0301 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,296 | $3,276 | Not Implemented |
SF0301 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,705 | $17,952 | Not Implemented |
MI0099 # 01 Y:2005 | 01 | 2005 | REPLACE BOILER | $31,718 | $82,200 | Implemented |
MI0099 # 02 Y:2005 | 02 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $16,520 | $7,062 | Not Implemented |
MI0099 # 03 Y:2005 | 03 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $11,973 | $2,750 | Implemented |
MI0099 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,746 | $4,736 | Not Implemented |
MI0099 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,897 | $470 | Implemented |
MI0099 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,355 | $1,750 | Implemented |
MI0099 # 07 Y:2005 | 07 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $200 | $115 | Implemented |
AS0394 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,769 | $3,632 | Not Implemented |
AS0394 # 02 Y:2005 | 02 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $18,219 | $1,000 | Not Implemented |
AS0394 # 03 Y:2005 | 03 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,961 | $321 | Not Implemented |
AS0394 # 04 Y:2005 | 04 | 2005 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $71,792 | $33,000 | Not Implemented |
AS0394 # 05 Y:2005 | 05 | 2005 | $443,040 | $453,047 | Implemented | |
AM0482 # 01 Y:2005 | 01 | 2005 | TREAT AND REUSE RINSE WATERS | $50,000 | $2,000 | Implemented |
AM0482 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,940 | $500 | Implemented |
AM0482 # 03 Y:2005 | 03 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,210 | $0 | Implemented |
AM0482 # 04 Y:2005 | 04 | 2005 | USE SYNTHETIC LUBRICANT | $1,020 | $0 | Implemented |