IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

975

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0082 # 08 Y:1987 08 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,137 $200 Implemented
CO0082 # 09 Y:1987 09 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $865 $300 Implemented
CO0082 # 10 Y:1987 10 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,169 $100 Implemented
CO0082 # 11 Y:1987 11 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,008 $100 Implemented
CO0082 # 12 Y:1987 12 1987 IMPROVE LUBRICATION PRACTICES $3,325 $0 Not Implemented
CO0082 # 13 Y:1987 13 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,706 $1,116 Implemented
CO0082 # 01 Y:1987 01 1987 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,799 $2,000 Not Implemented
CO0082 # 02 Y:1987 02 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,490 $600 Not Implemented
CO0082 # 03 Y:1987 03 1987 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $8,099 $12,000 Not Implemented
CO0082 # 04 Y:1987 04 1987 INCREASE AMOUNT OF CONDENSATE RETURNED $6,600 $6,000 Implemented
CO0082 # 05 Y:1987 05 1987 REPAIR AND ELIMINATE STEAM LEAKS $2,860 $0 Implemented
CO0082 # 06 Y:1987 06 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,746 $300 Implemented
CO0082 # 07 Y:1987 07 1987 INSTALL TURBULATORS $1,574 $600 Implemented
CO0075 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,363 $10,500 Not Implemented
CO0075 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,439 $300 Not Implemented
CO0075 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,707 $10,000 Not Implemented
CO0075 # 04 Y:1986 04 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $14,637 $10,000 Not Implemented
CO0075 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $12,489 $0 Not Implemented
CO0075 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,024 $700 Not Implemented
CO0075 # 07 Y:1986 07 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,935 $800 Not Implemented
CO0075 # 08 Y:1986 08 1986 USE RADIANT HEATER FOR SPOT HEATING $3,692 $9,100 Not Implemented
CO0075 # 09 Y:1986 09 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,606 $12,000 Not Implemented
CO0075 # 10 Y:1986 10 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $366 $892 Not Implemented
CO0075 # 11 Y:1986 11 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,813 $903 Not Implemented
CO0076 # 01 Y:1986 01 1986 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,878 $200 Implemented