IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0085 # 03 Y:2023 03 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,403 $10,178 n/a
NL0085 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $808 $25 n/a
NL0085 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $525 n/a
SF0606 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,495 $1,440 Implemented
SF0606 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $5,475 $60 Implemented
SF0606 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,107 $564 Implemented
SF0606 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $5,279 $5,910 Implemented
SF0606 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,502 $8,173 Implemented
SF0606 # 06 Y:2023 06 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,028 $31,579 Not Implemented
SF0606 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,666 $923,010 Not Implemented
UU0224 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,006 $51 Implemented
UU0224 # 02 Y:2023 02 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,206 $7,560 Implemented
UU0224 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,006 $10,650 Implemented
UU0224 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,361 $1,485 Implemented
UU0224 # 05 Y:2023 05 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,224 $4,500 Not Implemented
UU0224 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,382 Implemented
MZ0347 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $3,495 $1,500 Not Implemented
MZ0347 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,034 $35,384 Implemented
MZ0347 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,827 $220 Not Implemented
MZ0347 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,683 $0 Implemented
MZ0347 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,018 $1,320 Not Implemented
MZ0347 # 06 Y:2023 06 2023 REPAIR AND ELIMINATE STEAM LEAKS $1,668 $380 Implemented
MZ0347 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,124 $22,000 Not Implemented
MU0035 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,081 $374 Not Implemented
MU0035 # 02 Y:2023 02 2023 KEEP EQUIPMENT CLEAN $216 $0 Not Implemented