Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,706
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0805 # 17 Y:2009 | 17 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,423 | $0 | Not Implemented |
UD0805 # 18 Y:2009 | 18 | 2009 | ISOLATE HOT OR COLD EQUIPMENT | $666 | $0 | Implemented |
TT0038 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,940 | $140,934 | Not Implemented |
TT0038 # 02 Y:2009 | 02 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $21,918 | $10,000 | Implemented |
TT0038 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,400 | $4,170 | Not Implemented |
TT0038 # 04 Y:2009 | 04 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $839 | $1,458 | Not Implemented |
TT0038 # 05 Y:2009 | 05 | 2009 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,893 | $0 | Implemented |
TT0038 # 06 Y:2009 | 06 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $33,000 | $0 | Not Implemented |
TT0038 # 07 Y:2009 | 07 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,036 | $1,600 | Implemented |
TT0038 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,000 | $4,900 | Implemented |
UF0426 # 01 Y:2009 | 01 | 2009 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $20,276 | $4,000 | Not Implemented |
UF0426 # 02 Y:2009 | 02 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $146,810 | $3,192 | Not Implemented |
UF0426 # 03 Y:2009 | 03 | 2009 | RECYCLE FLUORESCENT LAMPS | $328 | $3,405 | Not Implemented |
UF0426 # 04 Y:2009 | 04 | 2009 | INSTALL SKYLIGHTS | $2,555 | $238 | Implemented |
UF0426 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $1,764 | $481 | Not Implemented |
UF0426 # 06 Y:2009 | 06 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $50,000 | $25,000 | Not Implemented |
UF0426 # 07 Y:2009 | 07 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,382 | $2,382 | Not Implemented |
UF0426 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $234,287 | $67,220 | Not Implemented |
UF0426 # 09 Y:2009 | 09 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,528 | $628 | Implemented |
UF0426 # 10 Y:2009 | 10 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,591 | $568 | Not Implemented |
UF0426 # 11 Y:2009 | 11 | 2009 | INSTALL OCCUPANCY SENSORS | $24,539 | $0 | Not Implemented |
UF0426 # 12 Y:2009 | 12 | 2009 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $37,500 | $4,483 | Not Implemented |
UF0426 # 13 Y:2009 | 13 | 2009 | INSTALL COMMON HEADER ON COMPRESSORS | $229,898 | $0 | Not Implemented |
UF0426 # 14 Y:2009 | 14 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $1,083 | $0 | Not Implemented |
UF0426 # 15 Y:2009 | 15 | 2009 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $111,037 | $4,000 | Not Implemented |