IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,335

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0055 # 10 Y:1996 10 1996 RECOVER AND REUSE WASTE MATERIAL $1,054 $0 Not Implemented
KG0053 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,108 $13,600 Implemented
KG0053 # 02 Y:1996 02 1996 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,871 $6,433 Not Implemented
KG0053 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,070 $22,830 Implemented
KG0053 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $1,525 $18,000 Not Implemented
KG0053 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,099 $361 Implemented
KG0053 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $363 $450 Not Implemented
KG0053 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $178 $20 Not Implemented
KG0053 # 08 Y:1996 08 1996 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $73,944 $22,000 Not Implemented
KG0053 # 09 Y:1996 09 1996 RECOVER AND REUSE WASTE MATERIAL $13,420 $0 Implemented
AM0267 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $27,300 $65,100 Implemented
AM0267 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,640 $1,000 Implemented
AM0267 # 03 Y:1996 03 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,040 $2,500 Implemented
AM0267 # 04 Y:1996 04 1996 METER WASTE WATER $9,790 $2,200 Implemented
AM0267 # 05 Y:1996 05 1996 RECOVER AND REUSE COOLING WATER $6,110 $4,380 Not Implemented
AM0263 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $13,100 $28,200 Not Implemented
AM0263 # 02 Y:1996 02 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,700 $0 Implemented
AM0263 # 03 Y:1996 03 1996 USE SYNTHETIC LUBRICANT $2,980 $0 Not Implemented
AM0263 # 04 Y:1996 04 1996 CONVERT TO AQUEOUS CLEANING SYSTEM $2,700 $1,028 Not Implemented
AM0261 # 01 Y:1996 01 1996 BURN A LESS EXPENSIVE GRADE OF FUEL $40,374 $40,400 Implemented
AM0261 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $9,900 $25,000 Not Implemented
AM0261 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,000 $1,300 Implemented
AM0261 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,100 $1,000 Implemented
AM0261 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $960 $1,020 Not Implemented
AM0261 # 06 Y:1996 06 1996 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $970 $810 Implemented