IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0791 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $5,322 $2,727 n/a
GT0791 # 05 Y:2004 05 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $74,318 $31,600 n/a
GT0791 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $800 n/a
GT0791 # 07 Y:2004 07 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,622 $17,600 n/a
GT0791 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $607 $1,112 n/a
GT0791 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,041 $18,139 n/a
GT0791 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $6,882 n/a
GT0791 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,540 $14,700 n/a
OK0701 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $11,182 $123,420 Implemented
OK0701 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,527 $3,807 Not Implemented
OK0701 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $43,354 $1,623 Implemented
OK0701 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,396 $8,850 Implemented
OK0701 # 05 Y:2005 05 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,082 $13,500 Not Implemented
OK0701 # 06 Y:2005 06 2005 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,169 $275 Not Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UM0272 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,313 $3,000 Not Implemented
UM0272 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,631 $300 Implemented
UM0272 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,459 $5,009 Not Implemented
OK0700 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $78,457 $36,299 Not Implemented
OK0700 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $77,748 $3,000 Not Implemented
OK0700 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,054 $6,238 Not Implemented
OK0700 # 04 Y:2005 04 2005 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $293,585 $1,110,000 Not Implemented
OK0700 # 05 Y:2005 05 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $29,149 $3,000 Not Implemented
OK0700 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,498 $21,600 Not Implemented
OK0700 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $7,492 $15,000 Not Implemented