Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,050
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0744 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $15,238 | $36,792 | Implemented |
OR0744 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,963 | $2,340 | Implemented |
OR0744 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,766 | $8,671 | Not Implemented |
OR0744 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,065 | $18,105 | Implemented |
OR0742 # 01 Y:2021 | 01 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,010 | $0 | Implemented |
OR0742 # 02 Y:2021 | 02 | 2021 | REDESIGN PROCESS | $3,895 | $0 | Implemented |
OR0742 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,662 | $6,857 | Not Implemented |
OR0742 # 04 Y:2021 | 04 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,200 | $38,018 | Not Implemented |
OR0735 # 01 Y:2020 | 01 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $5,347 | $1,090 | Implemented |
OR0735 # 02 Y:2020 | 02 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,510 | $2,925 | Not Implemented |
OR0735 # 03 Y:2020 | 03 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $3,031 | $0 | Implemented |
OR0734 # 01 Y:2020 | 01 | 2020 | INCREASE USE OF AUTOMATION | $126,455 | $360,000 | Not Implemented |
OR0734 # 02 Y:2020 | 02 | 2020 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $44,429 | $117,388 | Not Implemented |
OR0734 # 03 Y:2020 | 03 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $20,357 | $6,830 | Not Implemented |
OR0734 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,078 | $220 | Not Implemented |
OR0725 # 01 Y:2019 | 01 | 2019 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $16,581 | $12,780 | Not Implemented |
OR0725 # 02 Y:2019 | 02 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $58,445 | $110,790 | Implemented |
OR0725 # 03 Y:2019 | 03 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $126,211 | $375,000 | Implemented |
OR0725 # 04 Y:2019 | 04 | 2019 | REPLACE BOILER | $2,159 | $0 | Not Implemented |
OR0717 # 01 Y:2019 | 01 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,163 | $0 | Implemented |
OR0717 # 02 Y:2019 | 02 | 2019 | MINIMIZE WATER USAGE | $20,973 | $587 | Not Implemented |
OR0717 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,061 | $7,650 | Not Implemented |
OR0717 # 04 Y:2019 | 04 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,624 | $3,273 | Not Implemented |
OR0717 # 05 Y:2019 | 05 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $204,215 | $143,400 | Not Implemented |
OR0710 # 01 Y:2018 | 01 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $80,821 | $56,937 | Not Implemented |