IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0594 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,223 $4,344 Not Implemented
SF0594 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,717 $13,055 Not Implemented
SF0594 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,385 $9,100 Not Implemented
SF0594 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $559 $1,938 Not Implemented
UA0265 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,134 $400 Not Implemented
UA0265 # 02 Y:2022 02 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,737 $23,601 Not Implemented
UA0265 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $14,987 $4,205 Not Implemented
UA0265 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,413 $5,533 Not Implemented
UA0265 # 05 Y:2022 05 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,503 $34,984 Not Implemented
NL0075 # 01 Y:2022 01 2022 AIR CONDITION ONLY SPACE NECESSARY $13,412 $7,500 Implemented
NL0075 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $7,755 $28,900 Not Implemented
NL0075 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,652 Implemented
NL0075 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $980 $404 Implemented
NL0075 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $575 Not Implemented
LS2302 # 01 Y:2023 01 2023 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $16,597 $0 Not Implemented
LS2302 # 02 Y:2023 02 2023 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $594 $0 Not Implemented
LS2302 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $2,984 $325 Implemented
LS2302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $90 Not Implemented
LS2302 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $210 $25 Not Implemented
LS2302 # 06 Y:2023 06 2023 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,863 $5,000 Not Implemented
LS2302 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,715 $3,600 Not Implemented
LS2302 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,803 $19,030 Implemented
LS2302 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,895 $12,150 Not Implemented
LS2302 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $194 $700 Not Implemented
OR0763 # 01 Y:2023 01 2023 ADOPT IN-HOUSE MATERIAL GENERATION $172,258 $46,346 Not Implemented