Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,647
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0383 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,819 | $14,000 | Not Implemented |
SF0383 # 08 Y:2010 | 08 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,999 | $26,118 | Not Implemented |
SD0423 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,697 | $0 | Not Implemented |
SD0423 # 02 Y:2009 | 02 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $995 | $130 | Not Implemented |
SD0423 # 03 Y:2009 | 03 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $19,013 | $4,062 | Not Implemented |
SD0423 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,335 | $300 | Not Implemented |
SD0423 # 05 Y:2009 | 05 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,107 | $5,200 | Not Implemented |
SD0423 # 06 Y:2009 | 06 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,887 | $14,667 | Not Implemented |
SD0423 # 07 Y:2009 | 07 | 2009 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $217,707 | $718,800 | Not Implemented |
SD0421 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,500 | $6,463 | Not Implemented |
SD0421 # 02 Y:2009 | 02 | 2009 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $35,684 | $50,000 | Implemented |
SD0421 # 03 Y:2009 | 03 | 2009 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $94,850 | $12,450 | Not Implemented |
SD0421 # 04 Y:2009 | 04 | 2009 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $269,651 | $1,430,000 | Not Implemented |
SD0421 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,149 | $2,700 | Implemented |
SD0421 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,991 | $16,630 | Not Implemented |
SD0421 # 07 Y:2009 | 07 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $60,774 | $175,800 | Not Implemented |
SD0421 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $568 | $1,444 | Implemented |
SD0419 # 01 Y:2009 | 01 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,800 | $10,000 | Implemented |
SD0419 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,170 | $1,000 | Implemented |
SD0419 # 03 Y:2009 | 03 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,840 | $10,000 | Not Implemented |
SD0419 # 04 Y:2009 | 04 | 2009 | INCREASE AMOUNT OF CONDENSATE RETURNED | $15,940 | $2,263 | Implemented |
SD0419 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,905 | $161,162 | Implemented |
SD0419 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,102 | $50,136 | Not Implemented |
SD0419 # 07 Y:2009 | 07 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $14,906 | $500 | Not Implemented |
SD0416 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,133 | $35,628 | Implemented |