IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0330 # 07 Y:2002 07 2002 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $259 $65 Not Implemented
AS0330 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $23,186 $8,988 Not Implemented
WI0424 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $177,300 $0 Implemented
WI0424 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,921 $0 Implemented
WI0424 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,624 $0 Implemented
WI0424 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,745 $0 Implemented
LL0143 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $20,004 $29,820 Implemented
LL0143 # 02 Y:2002 02 2002 COMBINE UTILITY METERS $1,200 $0 Not Implemented
LL0143 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $504 $130 Not Implemented
LL0143 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $259 $0 Implemented
LL0143 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $137 $82 Implemented
AS0328 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $4,422 Implemented
AS0328 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $160 $375 Not Implemented
AS0328 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $675 Implemented
AS0328 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,442 $737 Implemented
AS0328 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $10,487 $2,091 Implemented
AS0328 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,223 $9,800 Implemented
AS0328 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $721 $1,200 Not Implemented
AS0328 # 08 Y:2002 08 2002 MINIMIZE WATER USAGE $663 $3,000 Not Implemented
LL0142 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,508 $3,000 Implemented
LL0142 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,986 $0 Not Implemented
LL0142 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $554 $289 Implemented
LL0142 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $406 $45 Not Implemented
LL0142 # 05 Y:2002 05 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $14,301 $0 Not Implemented
LL0139 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,787 $435 Implemented