IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0006 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,027 $5,000 n/a
CC0006 # 02 Y:2022 02 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,077 $60,000 n/a
CC0006 # 03 Y:2022 03 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $51,588 $175,000 n/a
CC0006 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,854 $13,360 n/a
CC0006 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,461 $10,000 n/a
AS0529 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,450,229 $9,600 Implemented
AS0529 # 02 Y:2022 02 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,386,000 $40,297 Implemented
AS0529 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,960 $18,000 Not Implemented
AS0529 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $27,045 $300,000 Implemented
AS0529 # 05 Y:2022 05 2022 MINIMIZE WATER USAGE $6,134 $40,000 Not Implemented
AS0529 # 06 Y:2022 06 2022 Install Anaerobic Digester $232,359 $1,128,000 Implemented
CC0005 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,985 $26,500 n/a
CC0005 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,273 $1,000 n/a
CC0005 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,217 $0 n/a
CC0005 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,997 $6,000 n/a
CC0005 # 05 Y:2022 05 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,973 $1,500 n/a
CC0005 # 06 Y:2022 06 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,225 $30,000 n/a
CC0005 # 07 Y:2022 07 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $36,944 $110,000 n/a
NL0071 # 01 Y:2022 01 2022 REPLACE BOILER $280,847 $220,000 Not Implemented
NL0071 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $106,955 $72,150 Implemented
NL0071 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,879 $30,410 Implemented
NL0071 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $3,139 $8,000 Not Implemented
NL0071 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,400 $9,724 Implemented
NL0071 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $4,500 Implemented
NL0071 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $407 $2,521 Implemented