IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,699

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0101 # 04 Y:1998 04 1998 MINIMIZE WATER USAGE $2,739 $0 Not Implemented
DS0101 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $5,125 $-6,000 Not Implemented
DS0101 # 06 Y:1998 06 1998 USE MECHANICAL STRIPPING METHODS $675 $2,295 Not Implemented
OR0311 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $112,722 $650,500 Not Implemented
OR0311 # 02 Y:1998 02 1998 USE OPTIMUM THICKNESS INSULATION $1,740 $4,421 Not Implemented
OR0311 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $8,062 $21,202 Not Implemented
OR0311 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,341 $20,064 Implemented
OR0311 # 05 Y:1998 05 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,035 $0 Implemented
OR0311 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,008 $1,514 Not Implemented
OR0311 # 07 Y:1998 07 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $273 $0 Implemented
OR0311 # 08 Y:1998 08 1998 KEEP BOILER TUBES CLEAN $1,431 $1,500 Not Implemented
OR0311 # 09 Y:1998 09 1998 MINIMIZE WATER USAGE $1,020 $0 Not Implemented
OR0311 # 10 Y:1998 10 1998 MINIMIZE WATER USAGE $275 $0 Not Implemented
CO0404 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,800 $5,000 Implemented
CO0404 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $280 Implemented
CO0404 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $365 $498 Implemented
CO0404 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $440 Implemented
CO0404 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200 $0 Implemented
CO0403 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,072 $6,685 Not Implemented
CO0403 # 02 Y:1997 02 1997 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,790 $2,000 Not Implemented
CO0403 # 03 Y:1997 03 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,180 $0 Not Implemented
CO0403 # 04 Y:1997 04 1997 REPAIR AND ELIMINATE STEAM LEAKS $380 $300 Not Implemented
CO0403 # 05 Y:1997 05 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $280 $810 Not Implemented
CO0403 # 06 Y:1997 06 1997 ELIMINATE SHIFT $3,120 $0 Not Implemented
OK0536 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $3,824 $1,549 Not Implemented