IAC Assessment: ME0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Ice-cream
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $1,000,000-$5,000,000
# of Employees 90
Plant Area (Sq.Ft.) 12,100
Annual Production 8,100,000 Pieces
Production Hrs. Annual 4,500
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,160 5,175,850 kWh $0.05
Electricity Demand $78,110 11,261 kW-months/year $6.94
Electricity Fees $80,126 - $ -
Fuel Oil #2 $40,546 7,587 MMBtu $5.34
TOTAL ENERGY COSTS $482,867
RECOMMENDED SAVINGS* $37,743 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,992
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,108
Cost:
$11,800
$6,480 72,098 $1,500 216 $(-2,872) (-307) - - - - - - $6,480
72,098
kWh
$1,500
216
kW-months/year
$(-2,872)
(-307)
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$4,700
Cost:
$900
$4,700 52,169 - - - - - - - - - - $4,700
52,169
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,563
Cost:
$2,500
$2,350 22,860 $213 33 - - - - - - - - $2,350
22,860
kWh
$213
33
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$512
Cost:
$185
$512 5,569 - - - - - - - - - - $512
5,569
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$337
Cost:
$400
- - - - - - $337 63 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$337
63
MMBtu
-
-
lb
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$325
Cost:
$400
- - - - - - $325 48 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$325
48
MMBtu
-
-
lb
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$319
Cost:
$590
- - - - - - $319 9 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$319
9
MMBtu
-
-
lb
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$236
Cost:
$93
- - - - - - $236 28 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$236
28
MMBtu
-
-
lb
-
-
$
09: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$23,643
Cost:
$31,200
- - - - - - - - $2,193 58,500 $21,450 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$2,193
58,500
lb
$21,450
-
$
TOTAL RECOMMENDED Savings:
$37,743
Cost:
$48,068
$14,042 152,696 $1,713 249 $(-2,872) (-307) $1,217 148 $2,193 58,500 $21,450 - $14,042
152,696
kWh
$1,713
249
kW-months/year
$(-2,872)
(-307)
MMBtu
$1,217
148
MMBtu
$2,193
58,500
lb
$21,450
-
$
TOTAL IMPLEMENTED Savings:
$8,992
Cost:
$5,068
$7,562 80,598 $213 33 - - $1,217 148 - - - - $7,562
80,598
kWh
$213
33
kW-months/year
-
-
MMBtu
$1,217
148
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $
Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Primary Raw Material