Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2413 # 02 Y:2024 | 02 | 2024 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $5,076 | $16,000 | n/a |
LS2413 # 03 Y:2024 | 03 | 2024 | INSTALL SENSORS TO DETECT DEFECTS | $5,700 | $30,000 | n/a |
LE0575 # 10 Y:2024 | 10 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $25,217 | $144,000 | n/a |
LE0575 # 09 Y:2024 | 09 | 2024 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $36,513 | $150,000 | n/a |
LE0575 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,618 | $2,720 | n/a |
LE0575 # 07 Y:2024 | 07 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $83,526 | $121,547 | n/a |
LE0575 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $242,187 | $285,000 | n/a |
LE0575 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $37,603 | $28,720 | n/a |
LE0575 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118,088 | $80,000 | n/a |
LE0575 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $45,906 | $7,700 | n/a |
LE0575 # 02 Y:2024 | 02 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $6,164 | $100 | n/a |
LE0575 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,173 | $100 | n/a |
TT0318 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $519,539 | $7,626,292 | n/a |
TT0318 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $25,497 | $30,000 | n/a |
TT0318 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,101 | $94 | n/a |
TT0318 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,027 | $65,640 | n/a |
TT0318 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,815 | $1,500 | n/a |
TT0318 # 06 Y:2024 | 06 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,885 | $12,180 | n/a |
TT0318 # 07 Y:2024 | 07 | 2024 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,912 | $15,000 | n/a |
TT0318 # 08 Y:2024 | 08 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,783 | $460 | n/a |
SF0621 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,755 | $300 | n/a |
SF0621 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,882 | $0 | n/a |
SF0621 # 03 Y:2024 | 03 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $6,435 | $478 | n/a |
SF0621 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $7,560 | $700 | n/a |
SF0621 # 05 Y:2024 | 05 | 2024 | INSTALL STEAM TRAP | $9,822 | $1,988 | n/a |