IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

312

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0138 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $165,235 $79,620 Not Implemented
DL0138 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $81,150 $0 Implemented
DL0138 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,410 $20,000 Implemented
DL0138 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,355 $7,475 Not Implemented
DL0138 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,660 $19,415 Not Implemented
DL0138 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,465 $650 Not Implemented
DL0138 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,870 $1,700 Not Implemented
DL0138 # 08 Y:2015 08 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,480 $0 Not Implemented
DL0138 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,280 $61,980 Implemented
DL0138 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,645 $13,720 Implemented
DL0138 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,660 $21,550 Implemented
DL0138 # 12 Y:2015 12 2015 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,315 $0 Not Implemented
LE0382 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,599 $0 Implemented
LE0382 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $555 $0 Implemented
LE0382 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,119 $0 Implemented
LE0382 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,431 $1,516 Not Implemented
LE0382 # 05 Y:2014 05 2014 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,534 $4,030 Not Implemented
LE0382 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $792 $2,500 Not Implemented
LE0382 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,433 $8,016 Implemented
LE0385 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,165 $40 Not Implemented
LE0385 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,455 $1,000 Implemented
LE0385 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,210 $3,040 Not Implemented
LE0385 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,746 $11,000 Implemented
LE0385 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $7,685 $12,000 Implemented
LE0385 # 06 Y:2014 06 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,266 $13,200 Not Implemented