IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2106 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $267 $100 n/a
UK2106 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,142 $640 n/a
UK2106 # 08 Y:2021 08 2021 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $731,255 $3,500,000 n/a
UK2106 # 09 Y:2021 09 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $49,643 $75,000 n/a
UK2106 # 10 Y:2021 10 2021 INSULATE BARE EQUIPMENT $1,250 $881 n/a
UK2106 # 11 Y:2021 11 2021 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,154 $600 n/a
SF0572 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,373 $200 Implemented
SF0572 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,781 $1,200 Implemented
SF0572 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $67 Not Implemented
SF0572 # 04 Y:2021 04 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $33,236 $25,695 Not Implemented
SF0572 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,961 $45,208 Not Implemented
SF0572 # 06 Y:2021 06 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,350 $4,996 Not Implemented
SF0572 # 07 Y:2021 07 2021 REPLACE BOILER $14,321 $72,000 Not Implemented
SF0572 # 08 Y:2021 08 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $343,451 $2,394,442 Not Implemented
SF0572 # 09 Y:2021 09 2021 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $134,491 $56,667 Not Implemented
SF0572 # 10 Y:2021 10 2021 INSTALL SUB-METERING EQUIPMENT $8,446 $6,896 Implemented
SD0612 # 01 Y:2021 01 2021 REDESIGN PROCESS $39,942 $13,000 Implemented
SD0612 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,879 $12,356 Implemented
SD0612 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,826 $9,545 Implemented
SD0612 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $957 $0 Implemented
SD0612 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,530 $9,245 Not Implemented
SD0612 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,883 $2,800 Not Implemented
SD0612 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $14,829 $44,568 Not Implemented
SD0612 # 08 Y:2021 08 2021 REPAIR AND ELIMINATE STEAM LEAKS $557 $1,000 Implemented
OR0742 # 01 Y:2021 01 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,010 $0 Implemented