IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0596 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,326 $6,711 Not Implemented
OR0596 # 06 Y:2012 06 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $80,359 $51,328 Not Implemented
OR0596 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $48,291 $10,000 Implemented
OR0587 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $11,403 $11,403 Not Implemented
OR0587 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,687 $1,000 Not Implemented
OR0587 # 03 Y:2012 03 2012 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,142 $6,108 Not Implemented
OR0587 # 04 Y:2012 04 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,099 $1,560 Not Implemented
OR0587 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,854 $2,854 Implemented
OR0587 # 06 Y:2012 06 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $7,810 $9,114 Not Implemented
OR0587 # 07 Y:2012 07 2012 Install Anaerobic Digester $75,601 $294,329 Not Implemented
OR0584 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,320 $0 Not Implemented
OR0584 # 02 Y:2012 02 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $26,558 $19,925 Not Implemented
OR0584 # 03 Y:2012 03 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,839 $29,000 Not Implemented
OR0584 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,631 $27,000 Not Implemented
OR0584 # 05 Y:2012 05 2012 MINIMIZE WATER USAGE $4,574 $7,000 Not Implemented
OR0584 # 06 Y:2012 06 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,796 $19,701 Not Implemented
OR0584 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,152 $251,677 Not Implemented
UW0050 # 01 Y:2011 01 2011 PAY BILLS ON TIME TO AVOID LATE FEES $0 $0 Implemented
UW0049 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,931 $67,308 Not Implemented
UW0049 # 02 Y:2011 02 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,443 $7,200 Implemented
UW0049 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $1,300 Implemented
UW0049 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,029 $1,810 Not Implemented
UW0047 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,466 $57,117 Not Implemented
UW0047 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,626 $11,606 Not Implemented
UW0047 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $400 $410 Not Implemented