Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0382 # 02 Y:1992 | 02 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $909 | $606 | Implemented |
OK0382 # 03 Y:1992 | 03 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,333 | $2,790 | Implemented |
OK0382 # 04 Y:1992 | 04 | 1992 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $12,447 | $29,926 | Implemented |
OK0382 # 05 Y:1992 | 05 | 1992 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $20,707 | $66,000 | Not Implemented |
OK0382 # 06 Y:1992 | 06 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $372 | $2,263 | Implemented |
OK0378 # 01 Y:1992 | 01 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,528 | $700 | Not Implemented |
OK0378 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,435 | $3,500 | Implemented |
OK0378 # 03 Y:1992 | 03 | 1992 | HEAT WATER WITH EXHAUST HEAT | $8,382 | $270 | Implemented |
OK0378 # 04 Y:1992 | 04 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,156 | $3,125 | Not Implemented |
OK0378 # 05 Y:1992 | 05 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,553 | $2,183 | Implemented |
OK0378 # 06 Y:1992 | 06 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $70 | $0 | Not Implemented |
OK0378 # 07 Y:1992 | 07 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,948 | $8,560 | Not Implemented |
OK0375 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $595 | $0 | Implemented |
OK0375 # 02 Y:1992 | 02 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,925 | $0 | Implemented |
OK0375 # 03 Y:1992 | 03 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,604 | $505 | Not Implemented |
OK0375 # 04 Y:1992 | 04 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,338 | $0 | Implemented |
GT0464 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,631 | $10,600 | Not Implemented |
GT0464 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,670 | $6,000 | Not Implemented |
GT0464 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $247 | $375 | Not Implemented |
GT0464 # 04 Y:1992 | 04 | 1992 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $256 | $300 | Not Implemented |
GT0464 # 05 Y:1992 | 05 | 1992 | REPLACE BOILER | $8,120 | $18,000 | Not Implemented |
GT0464 # 06 Y:1992 | 06 | 1992 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $13,680 | $23,500 | Not Implemented |
WI0147 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,588 | $0 | Not Implemented |
WI0147 # 02 Y:1992 | 02 | 1992 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,926 | $30,000 | Not Implemented |
WI0147 # 03 Y:1992 | 03 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,906 | $2,140 | Not Implemented |