IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,689

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0004 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $827 $686 Implemented
IA0004 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $20 Implemented
IA0005 # 01 Y:1991 01 1991 HEAT WATER WITH EXHAUST HEAT $10,300 $25,000 Not Implemented
IA0005 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,463 $9,202 Not Implemented
IA0005 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,471 $0 Not Implemented
IA0005 # 04 Y:1991 04 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,575 $13,000 Not Implemented
IA0005 # 05 Y:1991 05 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,435 $5,300 Not Implemented
IA0006 # 01 Y:1991 01 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,855 $21,600 Implemented
IA0006 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,583 $2,375 Implemented
IA0006 # 03 Y:1991 03 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,884 $6,800 Implemented
IA0006 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $286 $395 Implemented
IA0006 # 05 Y:1991 05 1991 RECOVER AND REUSE COOLING WATER $3,302 $0 Implemented
IA0006 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $721 $945 Implemented
HO0007 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $0 Not Implemented
HO0007 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $694 $1,180 Not Implemented
HO0007 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $1,489 Not Implemented
HO0007 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,761 $0 Not Implemented
HO0007 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $187 $256 Not Implemented
WI0131 # 01 Y:1991 01 1991 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $73,453 $200,000 Not Implemented
WI0131 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,715 $0 Not Implemented
WI0131 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $249 $0 Not Implemented
WI0131 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,538 $0 Not Implemented
WI0131 # 05 Y:1991 05 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,206 $5,000 Not Implemented
WI0131 # 06 Y:1991 06 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,976 $4,900 Not Implemented
WI0131 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,759 $1,920 Not Implemented