Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1992 |
Principal Product | Processed Turkey |
NAICS | n/a |
SIC | 2015 - Poultry Slaughtering And Processing |
Sales | $100,000,000-$500,000,000 |
# of Employees | 850 |
Plant Area (Sq.Ft.) | 310,000 |
Annual Production | 100,000,000 Pounds |
Production Hrs. Annual | 4,680 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $914,557 | 25,579,426 | kWh | $0.04 |
Natural Gas | $559,204 | 216,746 | MMBtu | $2.58 |
TOTAL ENERGY COSTS | $1,473,761 | |||
RECOMMENDED SAVINGS* | $106,540 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $106,540 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $4,915 Cost: $250 |
$2,810 | - | $2,105 | - |
$2,810 - kWh |
$2,105 - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $8,350 Cost: $4,200 |
$8,350 | - | - | - |
$8,350 - kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $5,050 Cost: $6,000 |
- | - | $5,050 | 1,959 |
- - kWh |
$5,050 1,959 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $3,390 Cost: $2,450 |
- | - | $3,390 | 1,316 |
- - kWh |
$3,390 1,316 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,720 Cost: $3,860 |
- | - | $3,720 | 1,448 |
- - kWh |
$3,720 1,448 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $31,290 Cost: $7,560 |
$31,290 | 875,147 | - | - |
$31,290 875,147 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $585 Cost: $750 |
$275 | 19,930 | $310 | 120 |
$275 19,930 kWh |
$310 120 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $30,500 Cost: $60,000 |
- | - | $30,500 | 10,826 |
- - kWh |
$30,500 10,826 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $18,740 Cost: $57,080 |
$18,740 | 520,809 | - | - |
$18,740 520,809 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $106,540 Cost: $142,150 |
$61,465 | 1,415,886 | $45,075 | 15,669 | $61,465 1,415,886 kWh |
$45,075 15,669 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $106,540 Cost: $142,150 |
$61,465 | 1,415,886 | $45,075 | 15,669 | $61,465 1,415,886 kWh |
$45,075 15,669 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |