IAC logo
IAC Assessment: CO0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1992
Principal Product Processed Turkey
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 850
Plant Area (Sq.Ft.) 310,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 4,680
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $914,557 25,579,426 kWh $0.04
Natural Gas $559,204 216,746 MMBtu $2.58
TOTAL ENERGY COSTS $1,473,761
RECOMMENDED SAVINGS* $106,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $106,540
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$4,915
Cost:
$250
$2,810 - $2,105 - $2,810
-
kWh
$2,105
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,350
Cost:
$4,200
$8,350 - - - $8,350
-
kWh
-
-
MMBtu
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$5,050
Cost:
$6,000
- - $5,050 1,959 -
-
kWh
$5,050
1,959
MMBtu
04: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$3,390
Cost:
$2,450
- - $3,390 1,316 -
-
kWh
$3,390
1,316
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,720
Cost:
$3,860
- - $3,720 1,448 -
-
kWh
$3,720
1,448
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,290
Cost:
$7,560
$31,290 875,147 - - $31,290
875,147
kWh
-
-
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$585
Cost:
$750
$275 19,930 $310 120 $275
19,930
kWh
$310
120
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$30,500
Cost:
$60,000
- - $30,500 10,826 -
-
kWh
$30,500
10,826
MMBtu
09: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$18,740
Cost:
$57,080
$18,740 520,809 - - $18,740
520,809
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$106,540
Cost:
$142,150
$61,465 1,415,886 $45,075 15,669 $61,465
1,415,886
kWh
$45,075
15,669
MMBtu
TOTAL IMPLEMENTED Savings:
$106,540
Cost:
$142,150
$61,465 1,415,886 $45,075 15,669 $61,465
1,415,886
kWh
$45,075
15,669
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas