IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0303 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,621 $9,954 Implemented
OK0303 # 03 Y:1990 03 1990 IMPROVE LUBRICATION PRACTICES $20,940 $0 Implemented
OK0303 # 04 Y:1990 04 1990 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,837 $2,075 Not Implemented
OR0076 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,574 $1,000 Implemented
OR0076 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,005 $652 Not Implemented
OR0076 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $655 $345 Implemented
OR0076 # 04 Y:1990 04 1990 DIRECT WARMEST AIR TO COMBUSTION INTAKE $658 $390 Not Implemented
OR0076 # 05 Y:1990 05 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,222 $3,600 Not Implemented
OR0076 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $206 $333 Implemented
OR0076 # 07 Y:1990 07 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,585 $6,190 Implemented
OR0076 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $434 $1,118 Implemented
OR0076 # 09 Y:1990 09 1990 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $486 $1,553 Not Implemented
OR0077 # 01 Y:1990 01 1990 USE MINIMUM STEAM OPERATING PRESSURE $1,772 $0 Not Implemented
OR0077 # 02 Y:1990 02 1990 INSULATE FEEDWATER TANK $755 $297 Not Implemented
OR0077 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $658 $478 Not Implemented
OR0077 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,589 $0 Implemented
OR0077 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $191 $166 Not Implemented
OR0077 # 06 Y:1990 06 1990 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,471 $3,766 Not Implemented
OR0077 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $491 $500 Implemented
OR0077 # 08 Y:1990 08 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,807 $6,145 Not Implemented
OR0077 # 09 Y:1990 09 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $2,117 Not Implemented
CO0170 # 01 Y:1989 01 1989 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,370 $3,200 Not Implemented
CO0170 # 02 Y:1989 02 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $660 $500 Not Implemented
CO0170 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,760 $1,000 Implemented
CO0170 # 04 Y:1989 04 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,273 $3,850 Implemented