IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0070 # 08 Y:1989 08 1989 OPTIMIZE PLANT POWER FACTOR $1,625 $3,450 Implemented
OR0072 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $134 $200 Implemented
OR0072 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $76 $50 Not Implemented
OR0072 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40 $49 Implemented
OR0072 # 04 Y:1989 04 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,002 $3,264 Not Implemented
OR0072 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,874 $7,000 Implemented
OR0073 # 01 Y:1989 01 1989 RECOVER AND REUSE COOLING WATER $2,582 $434 Implemented
OR0073 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $797 $150 Not Implemented
OR0073 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,597 $0 Implemented
OR0073 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $872 $883 Implemented
OR0073 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,024 $2,931 Implemented
OR0073 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $1,000 Implemented
OR0073 # 07 Y:1989 07 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,207 $2,980 Not Implemented
AM0075 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,170 $28,650 Not Implemented
AM0075 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,222 $1,200 Implemented
AM0075 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,340 $16,650 Not Implemented
AM0075 # 04 Y:1989 04 1989 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,597 $1,000 Not Implemented
AM0075 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $2,845 $2,500 Not Implemented
AM0075 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,895 $270 Implemented
AM0075 # 07 Y:1989 07 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,085 $1,500 Implemented
AM0075 # 08 Y:1989 08 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $135 Not Implemented
AM0075 # 09 Y:1989 09 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $640 $1,300 Implemented
WI0069 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,954 $0 Not Implemented
WI0069 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,584 $750 Not Implemented
WI0069 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $64 Not Implemented