IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0082 # 09 Y:1987 09 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $865 $300 Implemented
CO0082 # 10 Y:1987 10 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,169 $100 Implemented
CO0082 # 11 Y:1987 11 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,008 $100 Implemented
CO0082 # 12 Y:1987 12 1987 IMPROVE LUBRICATION PRACTICES $3,325 $0 Not Implemented
CO0082 # 13 Y:1987 13 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,706 $1,116 Implemented
GT0306 # 01 Y:1987 01 1987 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $23,465 $0 Implemented
GT0306 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $565 $300 Implemented
GT0306 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $11,954 $20,000 Not Implemented
GT0306 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $102 Not Implemented
GT0306 # 05 Y:1987 05 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $563 $778 Not Implemented
KU0215 # 01 Y:1987 01 1987 REDESIGN PROCESS $63,456 $20,000 Not Implemented
KU0215 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,823 $18,000 Not Implemented
KU0215 # 03 Y:1987 03 1987 INCREASE AMOUNT OF CONDENSATE RETURNED $17,747 $25,000 Implemented
KU0215 # 04 Y:1987 04 1987 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,037 $35,000 Not Implemented
KU0215 # 05 Y:1987 05 1987 INSTALL TURBULATORS $13,760 $12,000 Implemented
KU0215 # 06 Y:1987 06 1987 RECOVER WASTE HEAT FROM EQUIPMENT $9,163 $24,000 Not Implemented
KU0215 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,230 $5,203 Implemented
KU0215 # 08 Y:1987 08 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,109 $1,000 Not Implemented
KU0215 # 09 Y:1987 09 1987 RECOVER WASTE HEAT FROM EQUIPMENT $2,928 $400 Not Implemented
KU0215 # 10 Y:1987 10 1987 IMPROVE LUBRICATION PRACTICES $1,145 $1,750 Not Implemented
KU0215 # 11 Y:1987 11 1987 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $372 $0 Implemented
KU0215 # 12 Y:1987 12 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $200 Not Implemented
KU0215 # 13 Y:1987 13 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $20 Not Implemented
CO0075 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,363 $10,500 Not Implemented
CO0075 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,439 $300 Not Implemented