IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0052 # 10 Y:1986 10 1986 INSTALL SET-BACK TIMERS $1,267 $657 Implemented
MA0052 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $41 Not Implemented
MA0052 # 02 Y:1986 02 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $589 $900 Implemented
MA0052 # 03 Y:1986 03 1986 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $375 $0 Implemented
MA0052 # 04 Y:1986 04 1986 BURN WASTE PAPER FOR HEAT $31,590 $40,000 Not Implemented
MA0052 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $449 $1,060 Not Implemented
MA0052 # 06 Y:1986 06 1986 HEAT WATER WITH EXHAUST HEAT $383 $1,500 Implemented
KU0183 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $4,326 $4,279 Implemented
KU0183 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $4,048 $6,000 Not Implemented
KU0183 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,213 $0 Implemented
KU0183 # 04 Y:1986 04 1986 IMPROVE LUBRICATION PRACTICES $2,059 $1,500 Implemented
KU0183 # 05 Y:1986 05 1986 OPTIMIZE PLANT POWER FACTOR $1,423 $2,500 Implemented
KU0183 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $626 $750 Implemented
KU0183 # 07 Y:1986 07 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $264 $375 Not Implemented
KU0183 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $132 $0 Not Implemented
MA0048 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $592 $180 Implemented
MA0048 # 02 Y:1985 02 1985 INSTALL TURBULATORS $636 $2,200 Implemented
MA0048 # 03 Y:1985 03 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $728 $1,700 Not Implemented
MA0048 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $2,710 Not Implemented
MA0048 # 05 Y:1985 05 1985 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,082 $2,095 Not Implemented
MA0048 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,733 $9,000 Not Implemented
LT0049 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,407 $0 Implemented
LT0049 # 02 Y:1985 02 1985 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $19,893 $35,000 Not Implemented
LT0049 # 03 Y:1985 03 1985 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,720 $10,000 Implemented
LT0049 # 04 Y:1985 04 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,800 $1,416 Not Implemented