IAC Assessment: CO0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1986
Principal Product MILK AND ICE CREAM
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 7,500 Thousand Gallons
Production Hrs. Annual 7,488
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,267 2,956,038 kWh $0.05
Natural Gas $84,499 18,987 MMBtu $4.45
TOTAL ENERGY COSTS $233,766
RECOMMENDED SAVINGS* $64,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,922
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$7,253
Cost:
$150
- - $7,253 1,630 -
-
kWh
$7,253
1,630
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,654
Cost:
$300
- - $4,654 1,046 -
-
kWh
$4,654
1,046
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$4,524
Cost:
-
$4,524 89,683 - - $4,524
89,683
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,159
Cost:
$1,800
$4,159 82,356 - - $4,159
82,356
kWh
-
-
MMBtu
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$6,121
Cost:
$6,000
- - $6,121 1,376 -
-
kWh
$6,121
1,376
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,221
Cost:
$800
$2,221 43,962 - - $2,221
43,962
kWh
-
-
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,895
Cost:
$300
- - $4,895 1,100 -
-
kWh
$4,895
1,100
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,811
Cost:
$150
$4,811 95,252 - - $4,811
95,252
kWh
-
-
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,116
Cost:
$820
- - $2,116 476 -
-
kWh
$2,116
476
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$493
Cost:
$560
$493 9,672 - - $493
9,672
kWh
-
-
MMBtu
11: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$3,185
Cost:
$450
$3,185 63,013 - - $3,185
63,013
kWh
-
-
MMBtu
12: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$518
Cost:
$500
- - $518 116 -
-
kWh
$518
116
MMBtu
13: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$86
Cost:
-
$86 1,758 - - $86
1,758
kWh
-
-
MMBtu
14: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,747
Cost:
$30,000
$15,747 38,687 - - $15,747
38,687
kWh
-
-
MMBtu
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,387
Cost:
$3,222
$3,387 67,116 - - $3,387
67,116
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,170
Cost:
$45,052
$38,613 491,499 $25,557 5,744 $38,613
491,499
kWh
$25,557
5,744
MMBtu
TOTAL IMPLEMENTED Savings:
$35,922
Cost:
$6,452
$16,486 326,494 $19,436 4,368 $16,486
326,494
kWh
$19,436
4,368
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas