IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0254 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $967 $225 Implemented
TN0254 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $197 $117 Implemented
UD0166 # 01 Y:1985 01 1985 RECOVER AND REUSE COOLING WATER $10,849 $7,160 Implemented
UD0166 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,600 $40,000 Implemented
UD0166 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,258 $50,000 Implemented
ST0028 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,542 $733 Implemented
ST0028 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,376 $96 Implemented
ST0028 # 03 Y:1985 03 1985 REDESIGN PROCESS $1,064 $0 Not Implemented
ST0028 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $446 $0 Implemented
ST0028 # 05 Y:1985 05 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $259 $750 Implemented
ST0028 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $640 $900 Implemented
ST0028 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $120 $50 Implemented
ST0028 # 08 Y:1985 08 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,380 $1,600 Not Implemented
ST0028 # 09 Y:1985 09 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,196 $900 Implemented
ST0028 # 10 Y:1985 10 1985 INSTALL STORM WINDOWS AND DOORS $4,625 $9,283 Not Implemented
ST0028 # 11 Y:1985 11 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,061 $5,000 Implemented
UD0162 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,788 $40 Implemented
UD0162 # 02 Y:1985 02 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $22,693 $50,000 Not Implemented
UD0162 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $35 Not Implemented
UD0162 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,806 $15,000 Not Implemented
CO0028 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,738 $620 Implemented
CO0028 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,873 $150,000 Implemented
CO0028 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,370 $10,000 Implemented
CO0028 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $653 $300 Implemented
CO0028 # 05 Y:1985 05 1985 AIR CONDITION ONLY SPACE NECESSARY $264 $2,000 Implemented