IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

426

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0295 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $586 $350 Not Implemented
LL0295 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $422 $180 Not Implemented
LL0295 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $273 $319 Not Implemented
LL0295 # 08 Y:2008 08 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $265 $152 Implemented
UF0412 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $207 $79 Not Implemented
UF0412 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,683 $42,414 Implemented
UF0412 # 03 Y:2008 03 2008 UPGRADE CONTROLS ON COMPRESSORS $12,505 $731 Implemented
UF0412 # 04 Y:2008 04 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,855 $795 Not Implemented
UF0412 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $17,781 $615 Implemented
UF0412 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $2,521 $0 Implemented
UF0412 # 07 Y:2008 07 2008 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,081 $534 Not Implemented
UF0412 # 08 Y:2008 08 2008 INSTALL SET-BACK TIMERS $15,103 $4,916 Implemented
UF0412 # 09 Y:2008 09 2008 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $1,822 $10,480 Implemented
UF0412 # 10 Y:2008 10 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $95,676 $20,000 Not Implemented
UF0412 # 11 Y:2008 11 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,359 $4,246 Implemented
UW0017 # 01 Y:2008 01 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,732 $17,259 Not Implemented
UW0017 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $982 Implemented
UW0017 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $338 $2,199 Not Implemented
UW0016 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,638 $0 Implemented
UW0016 # 02 Y:2008 02 2008 REPLACE BOILER $10,000 $20,000 Not Implemented
UW0016 # 03 Y:2008 03 2008 REPAIR OR REPLACE STEAM TRAPS $5,490 $5,600 Not Implemented
UW0016 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $7,000 $500 Implemented
UW0016 # 05 Y:2008 05 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,625 $8,550 Implemented
UW0016 # 06 Y:2008 06 2008 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,510 $10 Not Implemented
UW0016 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $892 $0 Not Implemented