Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0614 # 02 Y:2024 | 02 | 2024 | INSTALL REPLACEMENT DOORS | $18,319 | $3,440 | n/a |
SF0614 # 11 Y:2024 | 11 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $115,467 | $137,973 | n/a |
SF0614 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $297,557 | $1,115,655 | n/a |
SF0614 # 09 Y:2024 | 09 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,015 | $65,531 | n/a |
SF0614 # 08 Y:2024 | 08 | 2024 | MINIMIZE WATER USAGE | $30,298 | $117,500 | n/a |
SF0614 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,200 | $39,025 | n/a |
SF0614 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $5,096 | $15,079 | n/a |
SF0614 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $928 | $1,336 | n/a |
SF0614 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,821 | $44,432 | n/a |
SF0614 # 01 Y:2024 | 01 | 2024 | MINIMIZE WATER USAGE | $26,559 | $990 | n/a |
SF0614 # 03 Y:2024 | 03 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,093 | $915 | n/a |
SJ0013 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,579 | $0 | n/a |
SJ0013 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,556 | $4,600 | n/a |
SJ0013 # 03 Y:2024 | 03 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $28 | $235 | n/a |
SJ0013 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,372 | $104 | n/a |
SJ0013 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $47,814 | $107,262 | n/a |
SJ0013 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $22 | n/a |
SJ0013 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $733 | $0 | n/a |
SJ0013 # 09 Y:2024 | 09 | 2024 | COMBINE UTILITY METERS | $454 | $0 | n/a |
SJ0013 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,399 | $1,473 | n/a |
SF0613 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $141,513 | $823,750 | n/a |
SF0613 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,003 | $100 | n/a |
SF0613 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,636 | $2,272 | n/a |
SF0613 # 03 Y:2024 | 03 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $16,386 | $2,278 | n/a |
SF0613 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,117 | $3,083 | n/a |