Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
142
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0223 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $490,980 | $10,000 | Not Implemented |
DL0223 # 04 Y:2023 | 04 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $994 | $4,800 | Implemented |
DL0223 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,840 | $2,800 | Not Implemented |
DL0223 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,906 | $7,955 | Not Implemented |
DL0223 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,437 | $1,030 | Implemented |
DL0223 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $9,025 | $0 | Implemented |
DL0219 # 06 Y:2023 | 06 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,196 | $50,000 | Implemented |
DL0219 # 03 Y:2023 | 03 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $6,246 | $4,000 | Not Implemented |
DL0219 # 09 Y:2023 | 09 | 2023 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $51,679 | $50,000 | Not Implemented |
DL0219 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,178 | $10,128 | Implemented |
DL0219 # 07 Y:2023 | 07 | 2023 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $2,856 | $16,145 | Not Implemented |
DL0219 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $496 | $0 | Implemented |
DL0219 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,974 | $10,600 | Implemented |
DL0219 # 02 Y:2023 | 02 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $922 | $520 | Not Implemented |
DL0219 # 04 Y:2023 | 04 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,827 | $0 | Implemented |
WV0610 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,654 | $100 | Implemented |
WV0610 # 09 Y:2021 | 09 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,674 | $1,700 | Implemented |
WV0610 # 12 Y:2021 | 12 | 2021 | INSULATE BARE EQUIPMENT | $409 | $488 | Implemented |
WV0610 # 08 Y:2021 | 08 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,217 | $19,800 | Not Implemented |
WV0610 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,772 | $4,186 | Not Implemented |
WV0610 # 06 Y:2021 | 06 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,869 | $3,900 | Implemented |
WV0610 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,437 | $2,340 | Implemented |
WV0610 # 04 Y:2021 | 04 | 2021 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,861 | $600 | Implemented |
WV0610 # 03 Y:2021 | 03 | 2021 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $12,856 | $33,120 | Not Implemented |
WV0610 # 02 Y:2021 | 02 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $23,895 | $37,803 | Not Implemented |