IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0162 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $252 $0 n/a
DS0162 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $499 $105 n/a
DS0162 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $1,702 n/a
DS0162 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,888 $6,600 n/a
DS0162 # 02 Y:2000 02 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $762 $0 n/a
DS0162 # 01 Y:2000 01 2000 USE OPTIMUM THICKNESS INSULATION $4,196 $3,997 n/a
DS0162 # 07 Y:2000 07 2000 $420 $0 n/a
DS0113 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,935 $14,709 Not Implemented
DS0113 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $827 $598 Not Implemented
DS0113 # 03 Y:1998 03 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,899 $444 Not Implemented
DS0113 # 04 Y:1998 04 1998 MINIMIZE WATER USAGE $322 $448 Not Implemented
DS0113 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,147 $280 Not Implemented
DS0113 # 06 Y:1998 06 1998 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $344 $0 Not Implemented
DS0042 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,399 $13,871 Implemented
DS0042 # 07 Y:1995 07 1995 RECOVER WASTE HEAT FROM EQUIPMENT $10,317 $16,000 Not Implemented
DS0042 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $395 $58 Not Implemented
DS0042 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $325 $45 Implemented
DS0042 # 04 Y:1995 04 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $716 $328 Implemented
DS0042 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $611 $1,000 Not Implemented
DS0042 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,705 $6,010 Implemented
DS0019 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $443 $100 Not Implemented
DS0019 # 03 Y:1995 03 1995 DISCONNECT BALLASTS $922 $90 Not Implemented
DS0019 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,172 $11,346 Not Implemented
DS0019 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $7,900 $28,300 Not Implemented
DS0019 # 06 Y:1995 06 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $55,126 $259,000 Not Implemented