Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
284
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0239 # 09 Y:2024 | 09 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $44,586 | $1,934 | n/a |
DL0239 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,185 | $51,431 | n/a |
DL0239 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,587 | $28,225 | n/a |
DL0239 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $397,405 | $140,000 | n/a |
DL0239 # 05 Y:2024 | 05 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,543 | $2,247 | n/a |
DL0239 # 04 Y:2024 | 04 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $61,029 | $10,000 | n/a |
DL0239 # 03 Y:2024 | 03 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $37,050 | $110,000 | n/a |
DL0239 # 02 Y:2024 | 02 | 2024 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,623 | $17,500 | n/a |
DL0239 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,306 | $1,250 | n/a |
DL0211 # 02 Y:2022 | 02 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $233 | Not Implemented |
DL0211 # 11 Y:2022 | 11 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,347 | $16,607 | Implemented |
DL0211 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,764 | $2,451 | Not Implemented |
DL0211 # 09 Y:2022 | 09 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $28,000 | $61,800 | Not Implemented |
DL0211 # 08 Y:2022 | 08 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $3,578 | $13,772 | Implemented |
DL0211 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,560 | $28,388 | Not Implemented |
DL0211 # 06 Y:2022 | 06 | 2022 | RECOVER AND REUSE COOLING WATER | $52,650 | $50,000 | Implemented |
DL0211 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,276 | $31,550 | Implemented |
DL0211 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,500 | $120,300 | Not Implemented |
DL0211 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,800 | $600 | Not Implemented |
DL0211 # 01 Y:2022 | 01 | 2022 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $4,080 | $450 | Implemented |
NC0645 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,505 | $5,000 | Not Implemented |
NC0645 # 02 Y:2020 | 02 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $51,058 | $178,000 | Not Implemented |
NC0645 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,683 | $40,000 | Implemented |
NC0601 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,606 | $100 | Not Implemented |
NC0601 # 04 Y:2017 | 04 | 2017 | KEEP BOILER TUBES CLEAN | $2,408 | $1,000 | Implemented |